How much an MVP costs in the UK: the price bands, what drives them, and what quotes leave out.
By Zain Masroor · 14 October 2026 · 11 min read
A UK MVP costs anything from a no-code subscription and your own time to £10,000 to £25,000 from a studio that publishes its prices: Magora from £10,000, Foundry 5 from £15,000, Softgen from £24,000. Augustova builds one for £10,000 to £20,000, fixed. Scope drives the number, and running costs start on launch day.
Talk it through: book a free 30-minute call →The four price bands
There is no single UK price for an MVP, because the word covers everything from a clickable prototype to a product that takes payments from real customers. The useful comparison is by route: build it yourself in a tool, hire a freelancer by the day, or buy a fixed or published price from an agency or studio. Each route moves a different risk onto you, so the cheapest headline is not always the cheapest outcome.
A freelancer’s total is the day rate multiplied by the days. At the measured UK median of £525 a day, thirty working days is £15,750 before design, testing and project management, which you then do yourself. Studio prices bundle those roles into one number, which is why the published figures cluster between £10,000 and £25,000 for a first release.
| Route | How you pay | Published example | What you get |
|---|---|---|---|
| No-code or AI app builder, done yourself | A monthly subscription plus your own time | Bubble Starter $59 a month billed annually; Bolt Pro $25 a month | A working product you build and maintain yourself, within the tool’s limits |
| Freelance developer | A day rate, so the total depends on the days | UK software developer contract median £525 a day, London £529 | One person’s skills and availability; you manage scope, design and testing |
| Agency or studio with published prices | A starting or fixed price per scope | Magora from £10,000; Foundry 5 from £15,000; Softgen from £24,000 | A team covering design, build, testing and launch |
| Augustova | Fixed price against a written scope | £10,000 to £20,000, four to six weeks | One core workflow, accounts, Stripe payments, an admin view and analytics, in your name |
Tool and studio prices from each firm’s own pages, read October 2026, excluding VAT. Day rates from ITJobsWatch, six months to 14 September 2026. The thirty-day figure is simple arithmetic, not a quote.
What drives the cost
Almost every MVP quote is driven by the same handful of decisions. The number of user types matters most: a product with one kind of user is one product, while a marketplace with buyers, sellers and an admin is three. After that come the number of workflows, how money is taken, and how many other systems the product has to talk to. Each of these is a scoping decision before it is an engineering one, which is why a tight written scope is the cheapest thing you can bring to a quote.
Fixed price or time and materials
Time and materials bills for the hours spent, so the estimating risk sits with you: if the build takes twice as long, you pay twice as much. A fixed price agrees the scope and the number in writing before work starts, with a list of what is not included, so the estimating risk sits with the supplier. Neither is dishonest. Time and materials suits work that genuinely cannot be scoped yet; a fixed price suits a first product where the founder needs to know the number to raise or spend against it.
| Fixed price | Time and materials | |
|---|---|---|
| Who carries the estimating risk | The supplier | You |
| What is agreed up front | Scope, exclusions, price and timeline | A rate and an estimate |
| When something new comes up | Written up and quoted as a change or a later phase | Absorbed into the hours and the invoice |
| Best when | The core workflow can be written down | The problem cannot be scoped yet |
What MVP quotes usually leave out
Two quotes for the same idea can differ by thousands of pounds simply because one includes things the other leaves for later. Before comparing numbers, check each quote against this list and ask the supplier to say in writing which items are in and which are out.
What it costs to run after launch
An MVP starts costing money the day it goes live, and the bill grows with users rather than with time. The fixed part is hosting, the database, email sending, monitoring and any store memberships. The variable part is payment fees on every transaction and, if the product uses AI, the model cost of every request. That second number is the one founders most often miss, because an AI feature can cost more for a heavy user than that user pays.
The useful measure is cost per active user per month, set against what each user pays. Ask your supplier to show it before launch, with the AI spend attributed to each customer and feature and a spending ceiling that has been tested, so the first growth spurt does not arrive as a surprise invoice.
What our MVP price includes
We build a startup MVP for £10,000 to £20,000, fixed against a written scope, and launch it in four to six weeks. That covers one core workflow end to end, sign-up and accounts for one user type, payments through Stripe with usage metering, an admin view for the founder, analytics and error tracking, and a documented codebase in your repository. The code, the hosting and the provider accounts are in your name from day one, not on final payment.
Native mobile apps, a second user type and marketplace mechanics are quoted as later phases, within our app development range of £8,000 to £30,000 fixed per phase. It is the same stack we run our own products on: Onrolo, an applicant tracking system for UK recruitment agencies, and GoRizzume, a careers platform for UK students and graduates on web and mobile.
How to get quotes you can compare
Send every supplier the same one-page brief, and ask the same questions of every reply. The brief does more to bring the price down than any negotiation, because most of the spread in MVP quotes is suppliers guessing at scope differently.
Common questions
How much does an MVP cost in the UK?
From a no-code subscription and your own time, to £10,000 to £25,000 from studios that publish prices: Magora from £10,000, Foundry 5 from £15,000 and Softgen from £24,000 on their own pages in October 2026. Augustova builds a startup MVP for £10,000 to £20,000, fixed against a written scope.
Can I build an MVP for under £10,000?
Yes, by building it yourself in a no-code or AI app builder, or with a freelancer on a narrow scope. You trade money for your own time and for the design, testing and project management a studio would otherwise include.
How long does an MVP take to build?
Published studio timelines run from four weeks (Foundry 5) to six to eight weeks (Magora). Ours is four to six weeks to a launch that users can pay for, with working software shown in the first week.
Is a fixed price better than time and materials for an MVP?
For most first products, yes, because the founder needs to know the number. A fixed price puts the estimating risk on the supplier and lists what is excluded; time and materials suits work that cannot be scoped yet.
What does an MVP cost to run after launch?
Hosting, database, email and monitoring on your own accounts, plus payment fees on every transaction (Stripe’s standard UK card rate is 1.5% plus 20p) and model costs for any AI feature. Measure it per active user per month.
Does your MVP price include mobile apps?
No. A responsive web app reaches the same users for less and can be followed by native iOS and Android apps once people are paying. Those are quoted as a later phase at £8,000 to £30,000 fixed.
Who owns the code?
With us, you do from day one: the repository, hosting and provider accounts are in your name, and launch comes with documentation, credentials and a runbook. Check this in every quote you compare.
Want a fixed price for your MVP?
Send the one workflow your first users will pay for. We reply with a written scope and a fixed price, or an honest reason to wait.